First Church Of Boston

7.6.09 First Church.jpg

PROJECT PROFILE:

We worked closely with the architect and historical department to design a new system that could be installed over the old concrete wall.  The wall had cracked and split from weather, so a new flat seam copper panel system was decided as the most sustainable product for this application.  To try to match the color of the original concrete wall, we first fabricated all the copper panels, painted the panels with the approved color, then installed the system.